Glossary of design and permit terms

Short definitions of what comes up between an office, a client and a planning authority. Written for people who have to use these documents, not for a textbook.

PB-1 (building permit application)

The official Polish building permit application form. The client or their attorney files it with the county office, together with the design and a full set of attachments.

Read more →

PB-5 (declaration of the right to use the property)

The client's declaration that they hold a legal title to the property allowing construction work on it. A mandatory attachment to a permit application and to a notification.

Read more →

Planning decision (warunki zabudowy, WZ)

A decision setting out what may be built on a plot and on what terms, used where no local zoning plan is in force.

Read more →

Local zoning plan (MPZP)

A local act of law that sets the use and the building rules for a specific area. Where one is in force, no planning decision is needed.

Read more →

Site development plan (PZT)

The part of the design showing the building on the plot: siting, distances, access, parking, utility connections and the site balance. Drawn on a surveyor's base map.

Read more →

Surveyor's base map for design

An up-to-date survey map of the plot and its surroundings, prepared by a surveyor specifically for the design. The base on which the site development plan is drawn.

Read more →

Author's site supervision

The designer checking that construction follows the design, and agreeing whether substitute solutions may be used during the build.

Read more →

Adaptation of a stock design

Fitting a catalogue design to a specific plot, local rules and ground conditions, carried out and signed by a licensed architect.

Read more →

Power of attorney in the permit process

The authorisation under which an architect or another person acts before the authority for the client: files the application, receives letters and answers requests.

Read more →

Access from a public road

The connection between a plot and a public road. Building or rebuilding it requires the road manager's consent, and on higher-category roads it is a separate procedure.

Read more →

Excluding land from agricultural production

The decision that allows farmland to be used for building. It applies to certain soil classes and can be a condition for starting work.

Read more →

Trusted profile signature

An electronic signature made with the Polish trusted profile on gov.pl. In dealings with the administration it carries the force of a handwritten signature, and parties also use it for contracts between themselves.

Read more →